Research Electro Optics
Mechanical system design-build of an R&D facility including Class 100 clean rooms, offices and laboratories. Services included piping, duct, load, and sizing calculations for systems and equipment; drafting/CAD redlines; permit and construction documents; and review of documents from all trades for coordination purposes.
|
Service:
Location: Facility Size: BEES: |
Implementation Assistance
Boulder, CO 107,000 sqft Kevin Mueller |